Shop 1 – Addition to main shop to allow installation of new HVAC in the paint area and a new Pangborn Automated Blasting Machine in the Blasting side of the shop.
Shop 2 – Addition to the front and back of Shop 2 as well as a wall separating the shop into 2 sides. Install new HVAC equipment in the paint side . Install new dust collection system on the hand blasting side. Upgrade the electrical and lighting.